NHPC Recruitment 2021

NHPC Recruitment 2021 

Total Vacancies: 16

Important Links

Advt. Details Click Here
Apply Online Click Here

Important Dates

Starting Date to Apply Online24 Nov 2021
Closing Date to Apply Online07 Dec 2021

Age Limit

For Gen/ UR Candidates18-30 years
Relaxation ( in Upper age limit )05 years for SC/ST candidates
03 years for OBC candidates

Job Location

Himachal Pradesh

Qualification

The applicant should have passed the 04 Year Engineering Degree examination in respective disciplines from any institution recognized by AICTE through regular mode.

Vacancy Details
Trade/DisciplineNo. of Post
Civil06
Electrical05
Mechanical04
IT/Computer Science01
Total16

NHPC

As on date NHPC Limited has become the largest organisation for hydropower development in India, with capabilities to undertake all the activities from conceptualization to commissioning in relation to setting up of hydro projects. NHPC Limited has also diversified in the field of Solar & Wind power.

NHPC Limited presently has an installation base of 7071.2 MW from 24 power stations including 2 nos projects in JV mode. Considering the impediments faced during execution of these projects such as unfavourable geological conditions, difficult law and order problems, inaccessible and remote locations, the achievement so far is commendable.

NHPC is presently engaged in the construction of 9 projects aggregating to a total installed capacity of 5999 MW which includes 2 hydro electric projects viz., 2000 MW Subansiri Lower HEP and 800 MW Parbati-II HEP and 1 solar Project of 40MW at Odisha being executed on ownership basis and 5 hydro projects and 1 solar project being executed through Subsidiary/ JV Companies viz., 500 MW Teesta-VI HE Project, 1000 MW Pakal Dul HE Project, 624 MW Kiru HE Project, 850 MW Ratle HE Project, 120 MW Rangit-IV HE Project and 65 MW Kalpi Solar Project. In addition, 15 Projects with aggregate capacity of 10787.1 MW are under clearance stage which includes 11 Schemes of NHPCโ€™s own and 04 in JV mode. Further, 3 projects with aggregate capacity of 1130 MW are in S&I stage.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top